AI-Native Document Processing
Products
Pricing
Contact
Log InTalk to an Expert
HomeProductsEngineering Diagram Takeoff: ODTakeoffDocument Digitization and Management: ODRecordsGIS Map Creation: ODMapsGuidesProduct updatesUse CasesPricingContactLog InTalk to an Expert

OpenDrawing

AI-Native Document Processing

Products

  • ODTakeoff
  • ODRecords
  • ODMaps

Company

  • How it works
  • Pricing
  • Contact

Resources

  • Guides
  • Product updates
  • Use cases

Legal

  • Privacy
  • Terms
  • Cookies

Social

© 2026 OpenDrawing. All rights reserved.
← Back to use cases
Use case

HVAC and Mechanical Contractors

November 20263 min read
HVAC and Mechanical Contractors

Direct Answer

On a mechanical bid package, estimators spend hours paging through mechanical sheets to count rooftop units, air handlers, variable air volume (VAV) boxes, fans and air devices against the schedules. ODTakeoff counts that equipment automatically using the project legend, while estimators measure duct, pipe and conduit lengths by hand with built-in tools in the same review screen before exporting.

Mechanical takeoffs eat time in the same place on every job: paging through mechanical sheets and counting tags. That is the part HVAC takeoff software should handle for mechanical, sheet metal and piping contractors. Rooftop units, air handlers, variable air volume (VAV) boxes, fan coils, exhaust fans and air devices all have to be found, counted and checked against the schedules. Electrical contractors do the same count from the other side, because every one of those units needs power, a disconnect switch and often controls.

The HVAC takeoff counting we take off your estimators

ODTakeoff reads the mechanical set and does the repetitive part of the takeoff.

  • Legend first. It reads the legend and abbreviations at the front of the set and searches the plans only for the symbols listed there.
  • Equipment counts. It counts tagged equipment across every mechanical sheet: rooftop units tagged RTU-1 through RTU-6, every VAV box on level 2 (VAV-2-01, VAV-2-02 and so on), exhaust fan (EF) and unit heater (UH) tags, pumps and fan coils. Your estimators still apply "TYP OF 8" notes (one tagged unit standing for eight) during review.
  • Air devices and accessories. Supply diffusers, return grilles, exhaust registers and dampers are counted by type wherever your scope needs them.
  • Schedule tie-in. Each tag is tied to its schedule row, so the electrical data (voltage, phase, minimum circuit ampacity and maximum overcurrent protection) sits next to the count for anyone pricing the power side.

Lengths are handled differently, on purpose. Duct, pipe and conduit runs overlap, change size and hide behind notes, so your estimators measure them by hand with built-in tools in the same review screen. Counts and lengths end up in one takeoff instead of two files. ODTakeoff stops at quantities: duct weight, gauge, labor hours and material cost are still calculated in the duct and piping estimating tools you already price with, fed by the export.

Setting it up for your shop

Every account is a custom deployment. We sit with your estimators to learn how your shop takes off a mechanical job: which equipment and devices you price, which symbols the engineers you bid for most often use, and how your estimating system or enterprise resource planning (ERP) system wants the data.

For a mechanical contractor, that may mean counting air devices by neck size and tracking every fire damper. For an electrical contractor, it may mean ignoring diffusers entirely and counting only powered equipment. We fine-tune our existing models and add rules for that scope, or train a new model on your own drawings, so the model only looks for what you bid. Items map to your own part numbers or cost codes.

Deployment can run in our US cloud, in your own cloud or on premises.

What comes out of a review

Your estimators see each detection on the sheet where it was found, with low-confidence items at the top of the queue. They accept, correct or delete, add the measured runs, and reconcile the equipment count against the schedules. Once reviewed, the takeoff exports to your estimating system or ERP in the format agreed during setup. There is no limit on users, so your whole estimating team can work in it.

For a full walkthrough of a mechanical takeoff, see our guide to the HVAC takeoff on mechanical drawings and our field guide to HVAC and mechanical drawing symbols. The release notes for HVAC and mechanical takeoff cover what went live.

Which OpenDrawing products contractors use

Mechanical and electrical contractors use ODTakeoff for bid packages. Firms with years of as-built mechanical drawings for service work can make that archive searchable by building, unit tag or job number with ODRecords. Contractors who work for municipal utilities may also come across ODMaps, which turns paper water, gas and electric network maps into geographic information system (GIS) maps.

To set up ODTakeoff for your mechanical takeoffs, talk to an expert.

Frequently Asked Questions

Does ODTakeoff measure ductwork and piping automatically?+

No. Equipment and symbol counts are automatic. Duct, pipe and conduit lengths are measured by your estimators with built-in tools in the same review screen, so counts and lengths land in one takeoff.

How does it help an electrical contractor on a mechanical job?+

It counts every powered unit on the mechanical sheets, such as rooftop units, exhaust fans, unit heaters and pumps, so each one can be checked for a circuit, a disconnect switch and controls before the bid goes out.

Does it read our equipment schedules and legend?+

Yes. It reads the mechanical legend at the front of the set and only looks for the symbols listed there, and it ties each equipment tag to its schedule row for review.

On this page

The HVAC takeoff counting we take off your estimatorsSetting it up for your shopWhat comes out of a reviewWhich OpenDrawing products contractors use
See it on your own drawings

Tell us what you need counted, indexed or mapped. We configure the model around your workflow.

Talk to an Expert

Keep reading

Defense Contractors
Use case

Defense Contractors

July 2026 · 3 min read
Data Centers and Energy
Use case

Data Centers and Energy

June 2026 · 3 min read
Electric Utilities
Use case

Electric Utilities

June 2026 · 3 min read

See it on your own drawings

Tell us what you need counted, indexed or mapped. We configure the model around your workflow.

Talk to an Expert