AI-Native Document Processing
Products
Pricing
Contact
Talk to an Expert
HomeProductsEngineering Diagram Takeoff: ODTakeoffDocument Digitization and Management: ODRecordsGIS Map Creation: ODMapsGuidesProduct updatesUse CasesPricingContactTalk to an Expert

OpenDrawing

AI-Native Document Processing

Products

  • ODTakeoff
  • ODRecords
  • ODMaps

Company

  • How it works
  • Pricing
  • Contact

Resources

  • Guides
  • Product updates
  • Use cases

Legal

  • Privacy
  • Terms
  • Cookies

Social

© 2026 OpenDrawing. All rights reserved.
← Back to use cases
Use case

Data Centers and Energy

June 20263 min read
Data Centers and Energy

Direct Answer

Data center teams use OpenDrawing in two ways. Existing facilities use ODRecords to turn one-lines, panel schedules and cable schedules into a searchable archive with structured records for data center infrastructure management (DCIM) and building management systems, and construction teams use ODTakeoff to count electrical and mechanical components and read panel schedules from the bid package.

A data center's electrical drawings answer the questions operators ask most: which uninterruptible power supply (UPS) feeds this row, how loaded is this panel, where does this feeder run. Digitizing data center electrical drawings turns one-line (single-line) diagrams, panel schedules and wiring schematics into records that can answer those questions directly. In an older facility those answers sit in paper prints, PDF scans and as-built redlines from several expansions. On a new build, the same kinds of drawings arrive as a bid package of hundreds of sheets that estimators have to count by hand.

Existing facilities: one-lines, panel schedules and cable schedules

For a facility in operation, ODRecords turns the drawing archive into a searchable archive with structured records. Typical scope:

DrawingWhat we pull out
One-line diagramsUtility feeds, switchgear, generators, transfer switches, UPS modules, power distribution units (PDUs), with ratings
Panel schedulesPanel name, circuit, breaker size, poles, load description, panel totals
Cable schedulesCable tag, from and to, conductor size and type, quantity
Equipment schedules and submittalsTags, ratings and model data as written on the sheet
Wiring and control schematicsDevices, terminal numbers, wire numbers and cross-references
Cooling system piping and instrumentation diagrams (P&IDs)Chillers, pumps, valves and instruments with their tags
As-built redlinesHand-marked changes, read alongside the original sheet

Paper originals are scanned through our partner with documented chain of custody. Each record keeps its drawing number and sheet, so a facilities engineer can open the source from any search result. The records export in an agreed format mapped to the fields your data center infrastructure management (DCIM) and building management systems expect, so the electrical layer can be loaded instead of retyped. The same connectivity and equipment ratings give power system studies and digital twin models a structured starting point.

New builds: electrical and mechanical takeoffs with ODTakeoff

For construction, ODTakeoff counts components across the electrical, mechanical and HVAC sheets of the bid package. It reads the symbol legend at the front of the set and searches only for those symbols, so a receptacle, a fixture type or a disconnect switch is counted the way the engineer drew it. Panel schedule extraction pulls every circuit, breaker, pole count and load, plus panel totals, from single schedules and split A/B schedules (one panel listed in two sections), typed or handwritten, CAD or scanned. On the mechanical side it counts equipment such as computer room air handler (CRAH) units, fans, variable air volume (VAV) boxes, diffusers and dampers.

Counts are automatic. Conduit, pipe and duct lengths are measured by the estimator with built-in tools in the same review screen. Each detection is linked to your own part numbers, and estimators review and correct the results before the numbers go into the bid. Our posts on panel schedule extraction and HVAC and mechanical takeoff cover both features.

Fitting the deployment to your drawings and part numbers

Data center drawings vary by design firm and by owner standard. We sit with your team to learn the drawing sets you work from and the fields or part numbers you need, then fine-tune our existing models and add rules for your workflow, or train a new model on your own drawings, so they look only for the components you care about. Every deployment is custom, with no free trial and no self-serve version. Deployment runs in a US cloud, in your own cloud, or on premises.

What each team gets out

Facilities teams get a searchable drawing archive and structured records ready for DCIM and building management systems. Estimators get reviewed counts and panel schedule tables linked to their part numbers, exported to the estimating workflow or enterprise resource planning (ERP) system in an agreed format, with unlimited users on the account.

Campuses with underground electric, water or gas networks still on paper maps can use ODMaps to turn them into a geographic information system (GIS) map.

To set up a deployment for your facility or your next build, talk to an expert.

Frequently Asked Questions

What data center drawings can be digitized?+

One-line diagrams, panel schedules, cable schedules, equipment schedules, as-built redlines and equipment submittals, whether they are paper, scans or CAD exports.

Does ODTakeoff measure conduit and duct lengths automatically?+

No. Component counts are automatic, and conduit, pipe and duct lengths are measured by the estimator with built-in tools in the same review screen.

Can the extracted data go into our data center infrastructure management (DCIM) or building management system?+

Yes. Records export in a format agreed during setup, mapped to the fields your DCIM and building management systems expect.

On this page

Existing facilities: one-lines, panel schedules and cable schedulesNew builds: electrical and mechanical takeoffs with ODTakeoffFitting the deployment to your drawings and part numbersWhat each team gets out
See it on your own drawings

Tell us what you need counted, indexed or mapped. We configure the model around your workflow.

Talk to an Expert

Keep reading

Defense Contractors
Use case

Defense Contractors

July 2026 · 3 min read
Electric Utilities
Use case

Electric Utilities

June 2026 · 3 min read
Electrical Manufacturers
Use case

Electrical Manufacturers

June 2026 · 3 min read

See it on your own drawings

Tell us what you need counted, indexed or mapped. We configure the model around your workflow.

Talk to an Expert