For switchgear, panelboard and control panel builders, the slow part of a request for quote (RFQ) comes before pricing. An application engineer has to read the customer's single-line diagrams, schematics, elevations and panel schedules, build the switchgear bill of materials from those drawings, one line per specification, and look up what your shop calls each one. On a busy week, quotes wait in line behind that work.
Building a switchgear bill of materials from drawings
ODTakeoff reads the drawing package the customer sent and builds the bill of materials for you to review.
- Diagrams. On single-line, three-line and control schematics, it finds breakers, transformers, current transformers (CTs), potential transformers (PTs), meters, protective relays, contactors, terminal blocks, pilot lights and the other components you price, and reads the rating beside each one: voltage, amperes, poles, interrupting rating, main bus rating, kVA (kilovolt-amperes), current transformer ratio, and protective device numbers under IEEE C37.2 (for example 50/51 for overcurrent or 87 for differential protection).
- Elevations. Front elevations show the door-mounted devices, such as meters, pilot lights and selector switches, which are counted with the rest. Section sizes and bus routing stay with your engineer.
- Panel schedules. It reads every row: circuit, breaker size, poles and load description, on single or split A/B schedules (one panel's circuits shown in two tables), typed or handwritten, CAD or scanned.
- Counting and grouping. Identical specifications become one line with a quantity, and each line keeps its source sheets.
- Part number matching. Each line is matched to your item master and given a proposed part number, so a "20A 3P 480V" callout comes out as your item, for example PB-3P-20-480.
Lines that do not match anything in your catalog come out flagged with the extracted specification. That is where an unusual interrupting rating or a relay function outside your standard designs shows up early, while there is still time to substitute or note an exception.
How a deployment is set up for a manufacturer
Every account is a custom deployment. We start by sitting with your application and sales engineers to see how a quote is built today: which drawing types your customers send, which components you price and which you ignore, and how your catalog describes your products.
From there we fine-tune our existing models and add rules for your workflow, or train a new model on your own diagrams when your drawings call for it. The model only looks for the components you care about, so your team is not sorting through detections of items you never quote. Matching is connected to your item master, and the export is set up in the format your enterprise resource planning (ERP) or quoting system already takes.
Deployment can run in our US cloud, in your own cloud or on premises.
What your team gets back
Each drawing package becomes a bill of materials your engineers review on screen, with every line tied to the symbol it came from. Low-confidence detections and uncertain part matches sit at the top of the review queue. Your engineer accepts, corrects or deletes, then runs the usual checks: reconcile the count, read the expensive lines against their sheets, confirm every line has a reference.
The reviewed bill of materials (BOM) exports with quantities, your part numbers and sheet references, ready for pricing. There is no limit on users, so sales, engineering and purchasing can all work from the same list. For more detail on the matching step, see our post on AI BOM generation from electrical drawings, and for the review itself, the electrical bill of materials checklist.
Which OpenDrawing products manufacturers use
Most manufacturers use ODTakeoff for RFQ drawing packages. Some also have cabinets of as-built drawings for equipment shipped years ago, and use ODRecords to turn that archive into a searchable index by job number, customer order or equipment tag. Builders who supply electric utilities may see ODMaps on the utility side, where we turn paper network maps into geographic information system (GIS) maps.
To set up ODTakeoff around your catalog and quoting process, talk to an expert.



